Abstract

This is demonstration content. The abstract, authors and identifiers shown here are fictional and were generated to illustrate how a published article page appears on the platform. Replace this record with a real accepted paper before launch.

Keywords

construction economics, demonstration data

How to cite

K. Ofori-Attah; L. Mensah; R. Kwarteng (2026). Cost overrun patterns in donor-funded road programmes: evidence from three West African corridors.SureBuilt Series. pp. 1โ€“12. https://doi.org/10.0000/sbs.demo.2026.001

Related papers