Abstract
Build-operate-transfer (BOT) building projects have long-term financial commitment and are exposed to a significant degree of uncertainty and risk. One mechanism of support provided by governments to attract private investment in public infrastructure is the option to abandon (OTA) which gives the private investor the right to abandon a project that is no longer financially viable. OTA has been relatively under-researched in comparison to other support mechanisms like the minimum revenue guaranty because its value is predicated on the joint evolution of cost, revenue and time rather than a single guaranty threshold. Previous works have dealt with transportation and energy concessions. However, few computational tools have been developed specifically for the PPP-BOT building projects. Moreover, traditional discounted cash flow approaches assume investment decisions as static and are unable to capture the value of the managerial flexibility offered by OTA. This paper seeks to fill this gap by developing a model based on the real options theory for evaluating OTA in the early investment appraisal stage of PPP-BOT building projects. Mathematical equations and algorithms were developed and implemented into a structured Microsoft Excel spreadsheet tool based on the binomial method of Real Options Analysis (ROA). The model was applied to a hypothetical PPP-BOT building project with realistic cost and revenue parameters. The binomial model generated a positive Abandonment Option Value (AOV) of 1.86, which supported the decision to invest for the private investor. While, the traditional NPV method generated a negative value of -2.02, recommending no investment. This discrepancy suggests that NPV systematically underestimates projects with embedded flexibility, confirming the advantage of using ROA for PPP-BOT investment appraisal. Sensitivity analysis reveals that inflation rate, rental value, concession period and volatility have the highest effect on AOV and hence require careful attention. This model provides a practical spreadsheet-based tool for investment analysts, concession negotiators and public sector agencies to value abandonment provisions in the early stages
Authors and affiliations
- Department of Building, Ahmadu Bello University, Zaria, Nigeria
How to cite
Yarima Sallau Lawal, Aliyu Makarfi Ibrahim, Ziyadul Hassan Ishaq (2026). A Model for Evaluating Option to Abandon (OTA) in Public-Private- Partnership (PPP) Building Projects.In: SURE-Built 2026 — 2nd Global Scholarship for Sustainable Built Environment Research Conference. SureBuilt Series.
Related papers
Barriers to the Implementation of the Nigerian Disability Act (2019) in Selected Public Buildings: Evidence from Nigeria’s Post-Independence Capital Territories
Effective implementation of disability legislation is essential to equitable access to public buildings, yet compliance with Nigeria's Discrimination Against Persons with Disabilities (Prohibition) Act (2019) remains limited despite statutory obligations. This study examined implementation…
Evaluating Therapeutic Architecture Principles in Wellness Resort Design: A Case Study of Lakowe Lakes Golf and Country Estate
Studies (CHES – CUCRID RESEARCH CLUSTER), Ota, Nigeria jesunifemi.akingbadepgs@stu.cu.edu.ng Therapeutic architecture in wellness resort design supports and enhances users' physical and mental well-being through principles such as natural integration, the use of art and…
Sustainable Healthcare Delivery through Digital Technology: focus on the Interior Design of Orthopaedic Wards in Public Hospital Buildings in Ekiti State, Nigeria Titilayo Elizabeth Adewumi¹*, Aminat Olorunfunmilayo Ajenifujah-Abubakar¹, Tolulope Aduke
Ensuring good health and well-being is one of the core Sustainable Development Goals (SDGs) that aims to support healthy lives and well-being for people of all ages. This involves providing affordable and environmentally friendly…